11
25-08
The Sponge City Project in Ningbo High-tech Zone has successfully passed the acceptance, and the city's spongeification has reached a new level.
Recently, Ningbo High-tech Zone Financial Investment and Innovation Center The sponge city construction achievements of the project have ushered in a key inspection—special acceptance. This acceptance is not only a major test of the project's construction effectiveness, but also an important milestone for Ningbo High-tech Zone on the road to urban spongification, marking a solid step forward in regional ecological construction and sustainable development.
Project Overview: Sponge Concept Integrated into Urban Context
The project site is located in the core area of Ningbo High-tech Zone, with a total land area of 17,654 square meters. In the planning and design stage, adhering to the core concept of sponge city "infiltration, stagnation, storage, purification, use, and discharge", various types of sponge facilities are carefully arranged. In the original plan, the rain garden area is 275 square meters, absorbing and purifying rainwater like a green sponge; the roof greening area is 1495 square meters, effectively alleviating roof rainwater runoff, and all indicators strictly meet the construction requirements of the sponge city, laying the foundation for the city's ecological balance from the source.
Strict Acceptance: Multi-dimensional Quality Control
This acceptance adopts a "strict data verification + on-site actual verification" dual verification mode to ensure that nothing goes wrong. The acceptance team is composed of industry experts, representatives of all parties involved in the construction, and personnel from the administrative department, and conducts a comprehensive and refined review of the project.
Data Verification:
The acceptance team carefully reviewed the technical data of the project from planning and design to construction, including design drawings, construction records, material inspection reports, etc., to ensure that the data is complete and standardized, and the data is true and reliable, and every link is traceable.
On-site Verification:
The focus was on checking the implementation of the core indicators of the sponge city, and the construction quality and functional compliance of key facilities such as roof greening, rainwater reuse system, and rain garden were checked on the spot. At the site, the acceptance team checked the slope and water storage capacity of the rain garden, and conducted a trial run of the rainwater reuse system (the reuse effect was good) to ensure that all facilities meet the design standards and can play their due role in actual operation.
Data Supplement: Consolidate the Integrity of Achievements
In order to ensure the integrity of the project report, the acceptance team requested supplementary image data such as retention well openings, rain gardens (signs), overflow wells (scales), and rainwater pretreatment equipment. These data will visually show the completion effect and operating status of the sponge facilities, and provide strong data support for the project to display the construction effect.
Future Outlook: Continue to Protect the City's Ecology
This time, the special acceptance of the sponge city construction effect of this project has been successfully passed, adding bricks and tiles to Ningbo High-tech Zone on the road of sponge city construction. At the same time, it also marks a key step for this project towards the delivery goal, and lays a solid foundation for the region to build a harmonious and friendly ecological environment.
In the future, the project operation department will continue to strengthen the later management and maintenance of sponge facilities, establish a long-term management mechanism, ensure that the construction achievements of the sponge city can play a long-term and stable role, create a more livable living environment for everyone, and make Ningbo High-tech Zone all the way on the road of green development!!!
Related News
Related News